Skip to content

Archive

Category: Staţie de epurare

Snapshot_2014-01-10_111109

EcoExpert Ltd. has worked out the detailed design for the WWTP and local sewerage network for Valcinet Village, Calarasi District. continue reading…

tigan
EcoExpert Ltd. has worked out the detailed design for the WWTP and local sewerage network for Tiganca Village, Cantemir District. A similar contract was signed with the Mayoralty of Valcinet Village, Calarasi District.

coste
In November 2010, EcoExpert Ltd. signed a contract with GTZ (German Technical Cooperation Office) for detailed design scheme for the reconstruction of local wastewater treatment plant in Duruitoarea Veche village, Costesti Community, Rascani District.

vorni

According to the Feasibility Study on the Sanitary Facility Development in Vorniceni Village was selected the optimal alternative of sewerage system and the detailed design was developed accordingly.

saci
Our experts have assessed the environmental impact of Geotube® Method of sludge dewatering of Chisinau Water Treatment Plant. This study was elaborated on demand of Chisinau Apa-Canal (Municipal Water Management Institution). continue reading…

Procesul de instalare

The project – Sanitary Facility Development in Chetrosu Village, Drochia District, was financed by CEI Special Fund for Climate and Environment Protection). The project was worked out on request of Chetrosu Mayoralty, Drochia District, in partnership with Ircon Co. from Czech Republic. Besides preparing the extension and development of the sewerage network, this project implied organizing different trainings and public hearing meetings, etc. Within the project, the following studies were done: Environmental Impact Assessment, Feasibility Study, Health Education Plan and Engineering Design. continue reading…